top of page

Methodology

The support follows defined steps to fully meet your requirements.

A complete structured approach

Remote or hybrid support.

"Nicolas was able to optimize our processes, streamline our flows, while maintaining balance with other departments thanks to his global vision of the company."

Eliot C.

Ekoscan

Requirement analysis

Any approach begins with a study of existing operational methods, in order to best adapt the tools to be implemented.

Capture d’écran 2025-05-01 à 08.35.52.png

Process modeling

The audit conducted with the teams enables workflow modeling to identify bottlenecks.

Capture d’écran 2025-05-01 à 08.34.36.png

Mapping - Connections between stakeholders

Visualization of connections between team members on the flows previously identified.

 

Capture d’écran 2025-05-01 à 08.47.19.png

Interface matrix between parties involved

Detection of dependencies between involved parties to identify critical points.

Capture d’écran 2025-05-01 à 09.03.41.png

Identification of data to centralize

Analysis of the tools used (software, documents) and the associated data flow.

Specification document development

Before selecting the tools, a comprehensive description of future uses is created in collaboration with the teams.

Capture d’écran 2025-05-01 à 10.39.36.png

Database structure

Based on the identified need, a common data architecture is defined.

Capture d’écran 2025-05-01 à 08.34.44.png

Modeling of new processes

The data flow is represented and validated with all stakeholders.

Capture d’écran 2025-05-01 à 09.14.17.png

User interfaces

The proposed solution is co-built with the team members to create tailored interfaces.

Capture d’écran 2025-05-01 à 09.31.41.png

Selection of automations

The best balance between automation and flexibility is found to streamline flow management.

Screenshot 2025-03-24 at 16.43.33.png

Validation workflows

The validation request system, along with the associated actions, is defined.

Implementation of tools

The selected tools are gradually implemented to ease the transition.

Screenshot 2025-03-24 at 16.50.41.png

Validation of the initial system

Based on the specifications, options are validated with the teams and a first version of the new system is implemented.

Capture d’écran 2025-05-01 à 09.56.30.png

Test phase

The chosen tool is tested on a reduced scale to identify points to modify and consolidate the system.

Capture d’écran 2025-05-01 à 09.47.04.png

Continuous improvement

User feedback from the field is taken into account and integrated into the tool.

 

Capture d’écran 2025-05-01 à 09.58.33.png

Training and procedure

Each employee is supported individually in their new practices and these are formalized in a procedure.

bottom of page